EPC Quotation — Restricted

ZAHU 200MW Solar PV + BESS · Zambia

ZAHU Energy Solutions — Solar PV + BESS EPC Quotation

Mumbwa District, Central Province, Zambia · Grid: 330kV Nambala Substation · Equipment procured from China (FOB) · Turnkey DAP site
Total EPC
EPC per Wp DC
EPC per Wac
BESS per kWh
Per MWh / year
EPC Base Cost (all systems, before contingency)
Contingency (5%)
TOTAL EPC PRICE — Turnkey, DAP Mumbwa Site, Zambia
Unit prices are editable (highlighted yellow when changed from baseline). Quantities scale automatically with the plant configuration in the sidebar: PV items in USD/kWp (DC), BESS items in USD/kWh, HV line in USD/km, lump sums fixed. Baseline prices derived from the Q3 2026 factory EXW/FOB quotation (1 USD = 6.80 CNY). Taxes, import duties and VAT in Zambia are NOT included. Quotation valid 90 days. Sea freight: Shanghai → Dar es Salaam (~35 days) + truck to Mumbwa.